Wellsite Supervision & Completion for Horizontal Heavy Oil & Disposal Wells

CG provided the engineering, regulatory support and wellsite supervision for the completion of two horizontal heavy oil wells and one water disposal well near Seal Lake, AB.

The completions involved running slotted liners through horizontal legs and a progressive cavity pump installation. These wells were subsequently tested and put onto production.

CG was also responsible for the engineering, licensing and construction of the heavy oil batteries associated with the three wells.

Once the wells were put onto production, CG Engineering managed the production and operations of these three wells including tracking and reporting production on a daily and monthly basis as well as managing regulatory compliance, health, safety and the environment for this area.

Client
Various

Date
June 19, 2011